Variation 1: Equipment assembly including earth and foundation work
- Excavation of the foundation holes for eibe pre-fabricated foundations or excavation of the foundation holes for on-site concrete foundations, where stipulated by eibe.
- Installation of eibe pre-fabricated foundations, when these have been ordered.
- Complete assembly and construction of play equipment in accordance with the assembly instructions
- Backfilling of the foundation holes and restoration to pre-existing condition.
Close window